How to Install the Smart LPG Meter?



1.The first step, install the pipe sections on both sides of the Roots flow meter, then install the universal pagoda joint. Pay attention to the installation direction at the air inlet.

2.The second step is to install the motor for the electric ball valve. 

3.The third step, connect the electric ball valve and the Roots flow meter, pay attention to the final positioning direction. 

4.The fourth step, apply glue to both sides of the pipe section to connect the hose, pay attention to the direction of the clamp and fasten the whole on the bottom plate of the plastic shell. 

5.The fifth step is to fasten the pressure regulating valve to the clamp and fix it on the bottom plate.

6.The sixth step, apply glue to connect the other end of the hose to the pressure regulating valve, cover the shell and turn it over to fix it.

7.The seventh step, install the battery and measurement communication board, pay attention to the Hall sensor at the bottom be aligned with the hole.

8.The eighth step, cover the upper cover and fix it in turn.

9.The ninth step, close the drawer cover and lock it; install the gas valve switch at the air outlet.

Finished.

 

Wuxi Zhongyi Smart Technology specializes in the production of smart water meters, electricity meters and gas meters, We can fully meet your needs and customize products for you. At the same time, our smart meters support lorawan, nb-iot, GPRS, WiFi, M-BUS, RS-485 and other communication methods. Welcome to consult!